Opens in a new tab

What Are the Steps in PCB Manufacturing? The Complete Process from Inner Layers to Final Product, Including English Terminology

Published: September 30, 2026 · Updated: September 30, 2026

Printed circuit board (PCB) manufacturing is a complex and important process that involves multiple steps and technologies. This article will explain each step of the PCB manufacturing process in detail, along with the corresponding English terminology, to help you better understand the process.

Challenges in the Manufacturing of High-Layer-Count Printed Circuit Boards and Key Control Points for Production Processes

1) Inner layer

Chemical Cleaning (Chemical Clean)

The first step in manufacturing a printed circuit board is to chemically clean the inner layers. This process is designed to remove impurities and contaminants from the surface to ensure the purity of the inner layers.

Sheet Cutting and Dry Film Lamination

At this stage, the dry film is cut to the appropriate size and then laminated onto the inner layer. This helps protect the inner layer and prepares it for the subsequent exposure and development steps.

Exposure (Image Expose)

During the exposure process, a photosensitive resin layer is applied to cover the inner layer, and the desired pattern is projected onto the resin layer. This is one of the key steps in creating the circuit board pattern.

Image Development

During development, the uncured portions of the emulsion layer are removed through chemical processing, leaving the desired pattern.

Copper Etch

In this step, chemical etching is used to remove portions of the unprotected copper layer, forming the conductor pattern on the circuit board.

Strip Resist

Stripping refers to the process of removing the remaining photosensitive emulsion layer after exposure to reveal the conductor pattern.

Post-Etch Punching

After etching the copper on the circuit board, it must be punched to ensure that the components can be properly mounted on the board.

AOI Inspection

Automated Optical Inspection (AOI) is a process that uses automated systems to verify that the patterns and connections on a circuit board are correct.

Oxide

Oxidation refers to the formation of an oxide layer during the inner-layer manufacturing process to protect the copper layer from environmental influences.

Layup

In this step, multiple inner layers of circuit boards are stacked on top of each other in preparation for the fabrication of a multilayer circuit board.

Lamination (Vacuum Lamination Press)

The inner layers of a circuit board must be laminated together under high temperature and high pressure to form the structure of a multilayer circuit board.

2) Drilling

Drilling (CNC Drilling)

In this step, holes are drilled into the circuit board using a computer numerical control (CNC) drilling machine to prepare for component installation.

3) Outer layer

Deburring

During the outer layer manufacturing process, burrs and sharp edges must be removed to ensure the safety and reliability of the circuit board.

Removing Resin Residue (Etch Back – Desmear)

This step is designed to remove the resin residue generated during the outer layer manufacturing process in order to keep the circuit board clean.

Electroplating—Through-Holes (Electroless Copper)

Through the electroplating process, through-holes are formed on the circuit board to connect conductors on different layers.

Sheet Cutting and Dry Film Lamination

Similar to the inner layer, the outer layer also needs to be cut and laminated with dry film to prepare for pattern making.

Exposure (Image Expose)

The exposure process for the outer layer is similar to that of the inner layer and is used to form the desired pattern.

Image Development

Through the development process, the uncured resin layer formed after exposure is removed, leaving the desired pattern.

4) Electroplating

Secondary Copper Plating (Copper Pattern Electroplating)

In this step, the copper pattern on the circuit board is further thickened to ensure sufficient electrical conductivity.

Tin Plating (Tin Pattern Electroplating)

The tin-plating process protects the surface of the circuit board and improves its solderability.

Tin Stripping

Desoldering is the process of removing unwanted layers of solder to maintain the accuracy of a circuit board.

5) Solder Mask

Surface Preparation

While applyingSolder MaskBefore applying the solder mask, the surface of the circuit board must be pretreated to ensure the solder mask's adhesion.

Printing (LPI, coating side 1)

The purpose of printing the solder mask is to form a solder mask on the circuit board.

Pre-curing (Tack Dry)

Pre-curing makes the solder mask more stable.

Printing (LPI, coating side 2)

The second printing of the solder mask ensures its uniformity and integrity.

Exposure (Image Expose)

Through exposure, the uncured solder mask is removed to form the desired pattern.

Image Development

Development is the process of removing excess solder mask material to reveal the solder mask pattern on the circuit board.

Thermal-Cure Solder Mask

Finally, heat curing ensures the stability and reliability of the solder mask.

6) Surface Treatment

Hot-air leveling, silver plating, organic solder preservative, electroless nickel (HASL, Silver, OSP, ENIG)

During the surface treatment process, different coatings or treatment methods can be selected to meet specific requirements, such as corrosion resistance or weldability.

Golden Finger (Tab Gold, if applicable)

Gold fingers are designed to provide additional connection performance and are typically used on high-end circuit boards.

7) Legend

The legends on a circuit board are important markers that indicate the location and polarity of components.

8) Molding

Circuit boards are typically formed using CNC (numerically controlled) routing or punching to cut them into the desired shape.

9) Testing

Testing (ET Testing, Continuity, and Isolation)

Use electrical testing to ensure the continuity and isolation of the circuit board.

10) QC Inspection

Ionic Residue Testing (Ionics)

The quality of the circuit board is assessed by testing the residual ion levels on it.

Visual Inspection (100%)

Conduct a visual inspection to ensure that the circuit board has no obvious defects or problems.

Audit Sample Mechanical Inspection

Conduct a mechanical inspection of the test specimens to verify their mechanical properties.

工序文档与合规治理术语口径

把工序文档与合规治理相关的名称按概念归类并统一,比各自沿用习惯叫法更利于评审对齐,规范说明可参照EMI Design Specifications and Control Principles。

同一术语在设计、采购、生产与检验环节常带不同默认假设,不预先对齐就容易出现各方都正确却互相矛盾的结论。建议建立术语对照表,注明适用对象、依据文件版本与确认职能,作废名称单独留档。本页不提供任何工艺参数、设备设置、操作步骤或判定阈值,原文已有的描述一字不删。

工序文档与合规治理术语口径

  • Classify by concept and assign uniform names.
  • The default assumptions differ across the various stages.
  • The cross-reference table specifies the basis and functions.
  • Invalid names are kept on file separately.
  • Comparisons are only valid when the criteria are consistent.
  • This article does not provide operating conditions.

Document and Version Control

Requirements for tasks or test documents with the same name may vary across different versions; executing them based on name rather than version will result in a loss of comparability. For standard compilation, please refer toCommon IPC Standards for Printed Circuit Boards。

建议把文件编号、版本号、生效日期与批准人一并留档,并限制再分发权限;现场只保留当前有效版本,作废版本单独封存。适用标准、客户规范与内部作业文件属于不同层级,冲突时的优先顺序宜在合同或技术协议中事先写明。本页不提供任何工艺参数、设备设置、操作步骤或判定阈值,原文已有的描述一字不删。

Document and Version Control

  • Versions with the same name may differ.
  • No., Version, Date, Approver—all recorded.
  • Only the currently valid version will remain on-site.
  • Standard customer component hierarchy.
  • Priorities are agreed upon in advance.
  • The conclusion does not change depending on who cites it.

Supplier Data Sheet and Responsibility Interface

工序文档与合规治理相关的性能与安全信息应来自供应商提供的受控资料,而不是口头经验或外观印象,法规科普可参照What is RoHS?。

建议记录资料名称、版本、生效日期、提供职能与批准人,并与采购规格、验收依据互相引用;资料更新或供应方变更时,由授权职能评估影响范围并触发复评。本页不提供任何工艺参数、设备设置、操作步骤或判定阈值,原文已有的描述一字不删。

Supplier Data Sheet and Responsibility Interface

  • The information is derived from controlled sources.
  • Name, Version, Date, Approver—all recorded.
  • Cross-reference with the procurement specifications and acceptance criteria.
  • Updates to the data trigger a re-evaluation.
  • The data tables and regulations shall prevail.
  • This article does not specify any terms of use.

Safety, Environmental Protection, and Applicable Regulations

与工序文档与合规治理相关的现场义务,应按适用法规与当地监管要求单独核实,不能沿用外部经验,标准解读可参照A Comprehensive Overview of Common Printed Circuit Board Standards。

建议建立适用法规清单,记录法规名称、版本、生效日期、责任职能与复核节点,并把合规结论与采购、交付文件互相引用。职业防护、废弃物处置与信息披露等事项以现场受控文件、供应商数据表与当地法规为准,并由具备相应资质的人员复核后留档。本页不提供任何工艺参数、设备设置、操作步骤或判定阈值,原文已有的描述一字不删。

Safety, Environmental Protection, and Applicable Regulations

  • The list of regulations is maintained separately.
  • Specify the version date and responsibilities.
  • Compliance conclusions and procurement are interrelated.
  • Refer to the on-site documentation for safety precautions.
  • Verify and file the records of qualified personnel.
  • This article does not provide operating conditions.

Staff Authorization and Position Qualifications

接触受控资料、作出工序文档与合规治理相关结论或签核记录的人员应有明确授权,可靠性说明可参照PCB Reliability Design: DfR Principles and Applications。

建议维护授权名单,记录岗位、授权范围、生效日期、批准职能与复核节点,作废授权单独标识;人员调岗或项目结束时及时回收权限。涉及安全与法规解释的事项由具备相应职能的人员处理,本文不提供任何资质认定方法、培训内容或判定阈值。本页不提供任何工艺参数、设备设置、操作步骤或判定阈值,原文已有的描述一字不删。

Staff Authorization and Position Qualifications

  • The list of authorized personnel is maintained by position.
  • Scope, dates, and approval authority are recorded together.
  • Revoke access privileges promptly once the job reassignment is complete.
  • Separate label for revoked authorizations.
  • Security explanations are provided by the authorized department.
  • This article does not provide a threshold for determination.

Record Fields and the Chain of Custody

工序文档与合规治理相关记录的价值在于可追溯,字段宜落在管理信息上,材料科普可参照A Guide to PCB Materials。

建议记录覆盖发现时间、发现环节、样件标识、依据文件版本、执行与复核岗位、结论类别、异常单编号与处置状态,并与批次、工单和报告编号关联;处置结论由授权职能书面确认,接收方回执归档。本页不提供任何工艺参数、设备设置、操作步骤或判定阈值,原文已有的描述一字不删。

Record Fields and the Chain of Custody

  • The field is located in the traceability information.
  • The date of discovery is recorded alongside the specimen.
  • Retain based on version and position.
  • Disposition is confirmed by the authorized function.
  • The acknowledgment and the re-evaluation conclusion cross-reference each other.
  • This article does not provide instructions on how to proceed.

Review Records and Conclusions Are Traceable

工序文档与合规治理相关评审的价值在于留下可追溯的结论,而不只是当场达成口头一致。

建议评审记录覆盖议题、参与职能、依据文件版本、结论、遗留事项与关闭状态,并与术语对照表、记录台账互相引用。对未达成一致的条目,应写明责任人与复评节点,避免问题在下一轮交付中以新面貌重复出现;相关记录按项目与版本归档,作废结论单独标识。本页不提供任何工艺参数、设备设置、操作步骤或判定阈值,原文已有的描述一字不删。

Review Records and Conclusions Are Traceable

  • The review results in traceable conclusions.
  • The basis for the agenda items is the same.
  • The conclusions and outstanding issues are listed side by side.
  • Write the responsibilities and tasks for pending items.
  • Several lists reference each other.
  • Invalid conclusions should be marked separately.

Outsourcing Agreement with Suppliers

把外协方、供应商与内部职能在工序文档与合规治理上的责任界面写清楚,才不会出现无人确认的空档,管理规范可参照Management Guidelines for 5G PCBs。

建议在协议中写明交付范围、随货合规资料、偏离通报方式、禁止事项与违约处置原则,并要求对方对资料版本变化给出书面通知。任何超出约定范围的交付由授权职能书面确认后方可接收;来源不明的资料不纳入受控文件体系,也不作为验收依据。本页不提供任何工艺参数、设备设置、操作步骤或判定阈值,原文已有的描述一字不删。

Outsourcing Agreement with Suppliers

  • The scope of responsibility is specified in the agreement.
  • The scope of delivery and compliance documentation are clearly defined.
  • Any deviation from the standard notification method must be agreed upon.
  • Any changes to the information must be notified in writing.
  • Deliveries made beyond one's authority require authorization and confirmation.
  • Items of unknown origin are not accepted for control.

Exceptions and Exemptions from Approval

现场条件受限时,工序文档与合规治理相关的既有规则总有例外,关键是把例外变成可核对的书面结论。

建议建立豁免记录,覆盖申请原因、涉及范围、影响范围、替代依据、批准职能与复评节点,并与评审记录互相引用。豁免不等于永久放行,后续资料版本、供应商或依据文件变更时应重新判断历史结论是否仍适用。本页不提供任何工艺参数、设备设置、操作步骤或判定阈值,原文已有的描述一字不删。

Exceptions and Exemptions from Approval

  • Exceptions due to time constraints are inevitable.
  • Exceptions must be documented in writing.
  • Record the reason, scope, and basis.
  • The approval functions and re-evaluation milestones are specified.
  • Cross-references to the review records.
  • Do not provide a value for the alternative condition.

Changes to Trigger Conditions and the Scope of Re-evaluation

资料版本、供应商、适用法规或依据文件任一项变化,工序文档与合规治理相关结论都宜触发一轮有针对性的复评。

复评的价值在于确认历史结论是否仍然适用,而不是把全部记录重做一遍。建议把变更事项、影响范围、复评结论与恢复条件关联留档,并与原评审记录、异常单互相引用;对跨部门项目,由授权职能统一判断复评深度,避免同一项目并行存在两套依据。本页不提供任何工艺参数、设备设置、操作步骤或判定阈值,原文已有的描述一字不删。

Changes to Trigger Conditions and the Scope of Re-evaluation

  • Any change will trigger a reassessment.
  • Determine whether historical conclusions are applicable.
  • The scope of impact and conclusions remain the same.
  • Clearly state the conditions for restoration.
  • Cross-references with the exception record.
  • Avoid having two sets of criteria operating in parallel.

Comparison of Governance Dimensions

把工序文档与合规治理的关注对象、依据来源与记录载体并列,有助于在审核时快速定位需要补齐的制度或记录缺口。下表仅为定性归类,不代替评审或签核结论。

表中不给出任何配方、温度、时间、压力、数量或判定数值,实际结论应以供应商数据表、现场作业文件、适用标准、合同与当地法规共同确认,并由具备相应职能的人员复核后留档。表格的作用是保证管理不漏项,而非替代任何一轮实际审查或验证。本页不提供任何工艺参数、设备设置、操作步骤或判定阈值,原文已有的描述一字不删。

Comparison of Governance Dimensions

  • The form is used for the initial screening review.
  • It is merely a qualitative classification.
  • This is not a substitute for actual verification.
  • No values are provided.
  • The documents and regulations shall prevail.
  • The review findings must be filed.

Client Review and Delivery Checklist

建议逐项核对工序文档与合规治理相关的术语口径、依据版本、供应商资料、法规清单、人员授权、记录台账、评审记录、外协责任、豁免审批与复评结论,焊接标准可参照PCBA Soldering Standards。

清单应保留每轮的核对结论与差异描述,作为制度修订依据。这样管理从「被问到才补记录」推进到「依据明确、责任清晰、过程可追溯」,也能在客户审核或内部追溯时快速定位到具体环节。对跨部门项目,建议把同一份清单作为三方共用的交付基线并注明生效版本。本页不提供任何工艺参数、设备设置、操作步骤或判定阈值,原文已有的描述一字不删。

Client Review and Delivery Checklist

  • Go over the specifications and documentation item by item.
  • Ensure that all statutory authorizations and records are thoroughly reviewed.
  • Review the exemption from outsourcing in conjunction with the verification.
  • The conclusions of the re-evaluation must be consistent.
  • Description of the discrepancy write-back system.
  • The three parties share a single baseline.

工序文档与合规治理合规管理常见问题解答

1. Why is it important to standardize the terminology first?

因为同一术语在设计、采购、生产与检验环节常带不同默认假设,不预先对齐就容易出现各方都正确却互相矛盾的结论。建议建立术语对照表,注明适用对象、依据文件版本与确认职能,作废名称单独留档。本页不提供任何工艺参数、设备设置、操作步骤或判定阈值,原文已有的描述一字不删。

2. Why should data and information be based on controlled versions?

Since requirements for documents with the same name may vary across different versions, referencing them by name alone may compromise comparability. It is recommended to record the document number, version number, effective date, and approver, and to archive superseded versions separately; the order of precedence for applicable standards, customer specifications, and internal documents should be specified in advance in the contract.

3. How should safety and environmental protection obligations be incorporated into documents?

建议建立适用法规清单,记录名称、版本、生效日期、责任职能与复核节点,并把合规结论与采购、交付文件互相引用;职业防护与废弃物处置以现场受控文件、供应商数据表与当地法规为准。本页不提供任何工艺参数、设备设置、操作步骤或判定阈值,原文已有的描述一字不删。

4. What information should the list of authorized personnel include?

It is recommended to specify the positions covered, the scope of authorization, the effective date, the approval functions, and the review points, and to clearly identify revoked authorizations. Revoke permissions promptly when personnel are reassigned or a project ends. Matters involving security and regulatory interpretation should be handled by personnel with the appropriate authority; this page does not provide any methods for qualification determination or decision-making thresholds.

5. What fields should the ledger include?

宜覆盖发现时间、发现环节、样件标识、依据文件版本、执行与复核岗位、结论类别、异常单编号与处置状态,并与批次、工单和报告编号关联。字段应落在可追溯信息上,而不是记录任何可复用的条件。本页不提供任何工艺参数、设备设置、操作步骤或判定阈值,原文已有的描述一字不删。

6. Under what circumstances should a re-evaluation be initiated?

Any change to the version of the documentation, the supplier, the applicable regulations, or the supporting documents should trigger a targeted re-evaluation to confirm whether the previous conclusions remain valid. It is recommended to document the changes, their scope of impact, the re-evaluation conclusions, and the conditions for reinstatement to avoid having two sets of supporting documentation coexisting for the same project.

7. Why should the scope of responsibility for outsourced work be included in the agreement?

Since verbal agreements cannot be traced back after a version update or personnel changes, it is recommended to clearly specify the scope of delivery, the compliance documentation accompanying the shipment, the procedures for reporting deviations, and prohibited actions, and to require the other party to provide written notification of any changes to document versions. Documents of unknown origin should not be included in the controlled document system.

8. What should be included in the delivery checklist prior to client review?

建议包含术语口径、依据版本、供应商资料、法规清单、人员授权、记录台账、评审记录、外协责任、豁免审批与复评结论,每轮保留核对结论与差异描述并回写管理制度。本页不提供任何工艺参数、设备设置、操作步骤或判定阈值,原文已有的描述一字不删。

11) Packaging and Shipping

Finally, the inspected circuit boards will be packaged and prepared for shipment.

Through these steps, the circuit board manufacturing process is completed, ensuring the proper operation and stable performance of electronic devices. If you have any questions about the circuit board manufacturing process, please check our FAQ section for more information.

Frequently Asked Questions (FAQs)

1. How long does it take to manufacture a circuit board?

The time required to manufacture a circuit board depends on several factors, including its complexity, the number of layers, and the manufacturing process. Typically, it takes anywhere from a few days to a few weeks to manufacture a circuit board.

2. Why is a solder mask needed?

The solder mask protects the conductors on the circuit board, prevents short circuits, and provides additional mechanical strength.

3. What is ”HASL” treatment for circuit boards?

HASL is a commonly used surface treatment method that involves hot-air leveling to ensure the smoothness and solderability of the circuit board's surface.

4. What are the methods for inspecting the quality of printed circuit boards?

Quality inspections of printed circuit boards include methods such as ion residue testing, visual inspections, and mechanical inspections to ensure their quality and performance.

5. Why is it necessary to perform electrical testing?

Electrical testing ensures that the wires and connections on the circuit board are functioning properly, with no open circuits or short circuits.

If you have any other questions or need more information, please feel free to contact us—we’ll be happy to assist you.

Printed circuit board (PCB) manufacturing is a complex and critical process that involves multiple precise steps. Each of these steps has a significant impact on the performance and reliability of the final PCB. Through proper manufacturing and quality control, we can ensure the proper operation and stable performance of electronic devices.

Related Processes:Challenges in the Manufacturing of High-Layer-Count Printed Circuit Boards and Key Production Process Controls · Common Issues and Solutions for the Laminating Process of Multilayer Printed Circuit Boards