Opens in a new tab

How to Design and Lay Out Low-Cost PCBs? Approaches Using Open-Source Hardware and Development Boards

Published: September 30, 2026 · Updated: September 30, 2026

PCB Design

One major trend in PCB design is the growing shift toward open-source hardware models and control systems; another is the explosive growth in development boards, with PCB design tools being increasingly used in the design of these boards. This article will explain how the industry has achieved low-cost PCB design and layout over the past 25 years.

I. Using the Development Board and Daughter Board Together

As PCB designs are increasingly used in conjunction with existing development boards, and as daughter boards are employed to drive hydraulic devices and servo motors or to perform tasks based on light, motion, and sound, PCB design trends are gradually shifting toward open-source hardware models and control systems.

II. Cost Advantages Offered by the Development Board Ecosystem

Another major trend in PCB design is the explosive growth of development boards. In October 2013, a survey was conducted among PCB designers worldwide, with respondents including professional engineers from 42 different countries.

Survey results show that nearly two-thirds of respondents (64%) believe development boards have, to some extent, reduced their need for custom PCB designs. At first glance, this finding may seem to threaten the development of PCB design, but the reality is that PCB design tools are being used in an increasing number of development board designs.

Nevertheless, PCB design has not undergone any fundamental changes since its inception. Innovations in the field of PCB design have consistently focused on reducing development costs and shortening development time, but PCB layout has remained essentially the same; the only thing that has continually changed is the use ofComponentsand product performance—which is also the root cause of most design complexity.

III. Several Approaches to Shortening the Design Cycle

In the face of a highly competitive environment, shortening product design cycles is crucial for engineers and managers. One of the top concerns for many companies is how engineers can obtain development tools that shorten time-to-market and reduce design costs, thereby addressing the increasing complexity of PCB design. The design cycle plays a decisive role in a product’s time to market, and PCB layout is often used to make up for delays in the early stages of the design process. Furthermore, given that manufacturers’ facilities and design teams are spread across the globe, it is not difficult to imagine how challenging it is to obtain the best development tools, which poses challenges for multiple design teams and time-to-market.

To address these challenges, manufacturers urgently need development tools that leverage existing resources, including human and computer-based tools that enable interoperability. These development tools are simple to use, scalable, and capable of connecting other time-consuming stages of the design process. Engineers frequently cite the following features of PCB design tools:

Offers a gradual learning curveundefined> “Allows multiple designers to work on the same project layout without sacrificing productivity”

Offers an ideal plug-and-play solution for performing resource-intensive tasks to boost productivity

Supports real-time collaboration among users around the world

At every stage of the design process, multidisciplinary technical experts can be brought in to support development and design without compromising production capacity.

Certain projects in the high-end segment of the electronics industry can be used to analyze designers’ actual designs, how chips function internally, and how they interact with their peripheral devices. For engineers, the challenge lies in how they can achieve this with minimal effort and the fewest errors—without relying on a bit of luck.

Although there are a large number of commercial products on the market (most of which are expensive—very expensive), only a few are reasonably priced… These products not only combine powerful features but also offer very low initial licensing costs. Features such as ease of use are becoming increasingly important, as they can effectively accelerate complex designs while reducing costs in the early stages of design.

The survey also examined the factors engineers prioritize when selecting PCB design software, such as price, functionality, ease of use, and technical support. The results clearly show that most design engineers place greater emphasis on functionality than on price when purchasing design tools, and 60% of respondents considered functionality to be an ”extremely important” factor. While we have consistently provided users with highly functional products, meeting user needs has become increasingly challenging with each new generation of software. Engineers need software that not only optimizes design time but also frees up more time for innovation and testing.

EAGLE is beloved by engineers worldwide and is widely used in the development of everything from open-source hardware to various collaborative engineering projects, including electric vehicles, Formula racing cars, microsatellites, and commercial lunar expeditions. The secret to EAGLE’s success lies in its ability to cater to both beginners and advanced users, offering a wide range of options that help significantly reduce the time required for design and testing.

There are a wide variety of completely free development tools available on the market for Linux, Mac, and Windows systems. When cost-saving is a priority, what product features do engineers consider when selecting development tools?

Support for Feature Extensions

More specifically, it performs simulations, data input and output, and custom commands through the User Language Program (ULP). EAGLE users have consistently strived for breakthrough innovations and have collectively enhanced the software’s versatility through the use of hundreds of ULPs. For example, the recently launched EagleUp 3D Design Converter enables engineers to export 2D layouts from EAGLE with a single click and import them into Google SketchUp, thereby creating precise 3D prototype simulations. This allows users to integrate multiple circuit boards into a single model, enabling them to detect misaligned connectors and ”collisions” between large components, while also allowing them to assess airflow around the device and test the availability of mounting points. These features are particularly useful when sharing and developing designs, as well as when reevaluating system-level issues. EAGLE also supports the import of mechanical format data from other manufacturers and provides all source code. The ULP framework allows users to build upon existing designs to create customized solutions that meet specific design requirements.

Speed Up the Design Cycle

Engineers typically place components on a circuit board, then load the schematic and place it on the PCB to simulate its behavior. A series of recent feature enhancements in CadSoft EAGLE version 6.4 now allow engineers to easily use Linear Technology’s high-performance SPICE simulator—LT-Spice—along with its schematic entry tools and waveform display. Users can now simulate existing EAGLE schematics and perform automatic conversion directly from within EAGLE.

Get a quick quote or a more streamlined design process

Although engineers have developed a bill of materials (BOM) that fits within the project’s budget and timeline and are ready to begin PCB production, they often need to submit the BOM for review and wait for a decision. As a result, engineers urgently need a specialized tool from a reliable, high-quality service partner that allows them to quickly obtain quotes for small-batch PCB production and access rapid prototyping services.

Large Component Library

This is crucial for productivity, as users cannot ”design custom components” for every component they plan to add to a circuit. EAGLE itself provides a wide variety of component libraries, and users can also access libraries provided directly by manufacturers or shared by other users through the EAGLE Community. Since creating even a small custom database from scratch for each component takes 20 minutes, component libraries that provide engineers with a reliable, information-rich resource center—vetted by active community members—can be of immense help to engineers in their design work.

To further simplify and speed up the design process, electronic design engineers can also use DesignLink, a specialized tool, to specify the components they need. By setting parameters, they can quickly search for suitable components in EAGLE’s online product database. In addition, engineers can access a wealth of technical information about components, including technical manuals, links to application-specific solution guides, pricing, and availability—all accessible directly within the EAGLE design environment without having to navigate between multiple web pages.

In summary, as trends in electronic design continue to evolve, core elements such as product functionality, usability, and price remain the factors that engineers value most highly.

Cost Structure and Terminology Standards for Business Governance

Classifying and standardizing terms related to cost structure and business governance by concept is more conducive to review alignment than continuing to use customary terminology; please refer to the standard guidelines for details.EMI Design Specifications and Control Principles。

The same term often carries different default assumptions across the design, procurement, production, and inspection phases; without prior alignment, it is easy for all parties to arrive at conclusions that are correct in their own right but mutually contradictory. It is recommended to establish a terminology cross-reference table that specifies the applicable scope, the version of the reference document, and the responsible party for confirmation; obsolete terms should be archived separately. This page does not provide any pricing formulas, markup percentages, cost figures, or pricing thresholds; all descriptions already present in the original text remain unchanged.

Cost Structure and Terminology Standards for Business Governance

  • Classify by concept and assign uniform names.
  • The default assumptions differ across the various stages.
  • The cross-reference table specifies the basis and functions.
  • Invalid names are kept on file separately.
  • Comparisons are only valid when the criteria are consistent.
  • This article does not provide operating conditions.

Document and Version Control

Requirements for tasks or test documents with the same name may vary across different versions; executing them based on name rather than version will result in a loss of comparability. For standard compilation, please refer toCommon IPC Standards for Printed Circuit Boards。

It is recommended that document numbers, version numbers, effective dates, and approver information be retained in the records, and that redistribution permissions be restricted; only the currently valid version should be kept on-site, while obsolete versions should be stored separately. Applicable standards, customer specifications, and internal operating procedures belong to different levels of hierarchy; the order of precedence in the event of a conflict should be specified in advance in the contract or technical agreement. This page does not provide any quotation formulas, markup percentages, cost figures, or pricing thresholds; the descriptions already present in the original text remain unchanged.

Document and Version Control

  • Versions with the same name may differ.
  • No., Version, Date, Approver—all recorded.
  • Only the currently valid version will remain on-site.
  • Standard customer component hierarchy.
  • Priorities are agreed upon in advance.
  • The conclusion does not change depending on who cites it.

Supplier Data Sheet and Responsibility Interface

Performance and safety information related to cost structure and business governance should be derived from controlled documentation provided by suppliers, rather than from verbal accounts of experience or visual impressions. For regulatory guidance, please refer toWhat is RoHS?。

It is recommended to document the name, version, effective date, responsible department, and approver of the documentation, and to cross-reference it with the procurement specifications and acceptance criteria; when the documentation is updated or the supplier changes, the authorized department shall assess the scope of impact and initiate a re-evaluation. This page does not provide any quotation formulas, markup percentages, cost figures, or pricing thresholds; the descriptions already present in the original text remain unchanged.

Supplier Data Sheet and Responsibility Interface

  • The information is derived from controlled sources.
  • Name, Version, Date, Approver—all recorded.
  • Cross-reference with the procurement specifications and acceptance criteria.
  • Updates to the data trigger a re-evaluation.
  • The data tables and regulations shall prevail.
  • This article does not specify any terms of use.

Safety, Environmental Protection, and Applicable Regulations

On-site obligations related to cost structure and business governance should be verified separately in accordance with applicable laws and local regulatory requirements; external experience cannot be applied directly. For guidance on interpreting standards, please refer toA Comprehensive Overview of Common Printed Circuit Board Standards。

It is recommended to establish a list of applicable regulations that records the regulation name, version, effective date, responsible functions, and review milestones, and to cross-reference compliance conclusions with procurement and delivery documents. Matters such as occupational safety, waste disposal, and information disclosure shall be governed by on-site controlled documents, supplier data sheets, and local regulations, and shall be reviewed by appropriately qualified personnel before being filed. This page does not provide any pricing formulas, markup percentages, cost figures, or pricing thresholds; the original text has been reproduced verbatim without any omissions.

Safety, Environmental Protection, and Applicable Regulations

  • The list of regulations is maintained separately.
  • Specify the version date and responsibilities.
  • Compliance conclusions and procurement are interrelated.
  • Refer to the on-site documentation for safety precautions.
  • Verify and file the records of qualified personnel.
  • This article does not provide operating conditions.

Staff Authorization and Position Qualifications

Personnel who access controlled information, draw conclusions regarding cost structure and business governance, or sign off on records must have explicit authorization; for a statement of reliability, please refer toPCB Reliability Design: DfR Principles and Applications。

It is recommended to maintain an authorization list that records job titles, scope of authorization, effective dates, approval functions, and review points, with revoked authorizations clearly marked. Revoke permissions promptly when personnel are reassigned or a project ends. Matters involving safety and regulatory interpretation should be handled by personnel with the appropriate authority; this document does not provide any methods for qualification determination, training content, or decision thresholds. This page does not provide any quotation formulas, markup percentages, cost figures, or pricing thresholds; the original text has been retained in its entirety without any deletions.

Staff Authorization and Position Qualifications

  • The list of authorized personnel is maintained by position.
  • Scope, dates, and approval authority are recorded together.
  • Revoke access privileges promptly once the job reassignment is complete.
  • Separate label for revoked authorizations.
  • Security explanations are provided by the authorized department.
  • This article does not provide a threshold for determination.

Record Fields and the Chain of Custody

The value of records related to cost structure and business governance lies in their traceability; the relevant fields should be included in management information. For reference, see the explanatory materials.A Guide to PCB Materials。

It is recommended to document the time of discovery, the stage at which it was discovered, the sample identification, the version of the reference document, the positions responsible for execution and review, the conclusion category, the anomaly ticket number, and the disposition status, and to link this information to the batch, work order, and report numbers. The disposition conclusion must be confirmed in writing by an authorized official, and the recipient’s acknowledgment must be filed. This page does not provide any pricing formulas, markup percentages, cost figures, or pricing thresholds; the original text has been reproduced verbatim without any omissions.

Record Fields and the Chain of Custody

  • The field is located in the traceability information.
  • The date of discovery is recorded alongside the specimen.
  • Retain based on version and position.
  • Disposition is confirmed by the authorized function.
  • The acknowledgment and the re-evaluation conclusion cross-reference each other.
  • This article does not provide instructions on how to proceed.

Review Records and Conclusions Are Traceable

The value of reviews related to cost structure and business governance lies in producing traceable conclusions, rather than merely reaching verbal agreements on the spot.

It is recommended that review records include the topic, participating functions, the version of the reference document, conclusions, outstanding items, and closure status, and that they cross-reference the glossary and record ledger. For items on which consensus has not been reached, the responsible person and the date for re-evaluation should be specified to prevent the issue from recurring in a different form in the next delivery cycle; Relevant records shall be archived by project and version, with invalid conclusions clearly marked. This page does not provide any pricing formulas, markup percentages, cost figures, or pricing thresholds; all descriptions present in the original text remain unchanged.

Review Records and Conclusions Are Traceable

  • The review results in traceable conclusions.
  • The basis for the agenda items is the same.
  • The conclusions and outstanding issues are listed side by side.
  • Write the responsibilities and tasks for pending items.
  • Several lists reference each other.
  • Invalid conclusions should be marked separately.

Outsourcing Agreement with Suppliers

Clearly define the boundaries of responsibility between external contractors, suppliers, and internal functions regarding cost structure and business governance to avoid any gaps where no one is accountable. Management guidelines can be referenced.Management Guidelines for 5G PCBs。

It is recommended that the agreement specify the scope of delivery, compliance documentation accompanying the goods, procedures for reporting deviations, prohibited actions, and principles for handling breaches of contract, and require the other party to provide written notice of any changes to document versions. Any delivery beyond the agreed scope may only be accepted after written confirmation by the authorized function; documents of unknown origin shall not be included in the controlled document system nor used as the basis for acceptance. This page does not provide any pricing formulas, markup percentages, cost figures, or pricing thresholds; the descriptions already present in the original text remain unchanged.

Outsourcing Agreement with Suppliers

  • The scope of responsibility is specified in the agreement.
  • The scope of delivery and compliance documentation are clearly defined.
  • Any deviation from the standard notification method must be agreed upon.
  • Any changes to the information must be notified in writing.
  • Deliveries made beyond one's authority require authorization and confirmation.
  • Items of unknown origin are not accepted for control.

Exceptions and Exemptions from Approval

When on-site conditions are limited, there are always exceptions to the established rules regarding cost structure and business management; the key is to turn those exceptions into verifiable, written conclusions.

It is recommended to establish an exemption record that covers the reason for the request, scope of application, scope of impact, basis for substitution, approval authority, and re-evaluation milestones, and that cross-references with the review record. An exemption does not constitute permanent approval; when subsequent versions of documentation, suppliers, or supporting documents change, a reassessment should be conducted to determine whether the historical conclusion remains applicable. This page does not provide any quotation formulas, markup percentages, cost figures, or pricing thresholds; the descriptions already present in the original text remain unchanged.

Exceptions and Exemptions from Approval

  • Exceptions due to time constraints are inevitable.
  • Exceptions must be documented in writing.
  • Record the reason, scope, and basis.
  • The approval functions and re-evaluation milestones are specified.
  • Cross-references to the review records.
  • Do not provide a value for the alternative condition.

Changes to Trigger Conditions and the Scope of Re-evaluation

Any change in data version, supplier, applicable regulations, or supporting documentation should trigger a targeted reassessment of the cost structure and related commercial governance conclusions.

The value of a re-evaluation lies in confirming whether historical conclusions remain valid, rather than redoing the entire record from scratch. It is recommended to document changes, the scope of impact, re-evaluation conclusions, and conditions for reinstatement, and to cross-reference these with the original evaluation records and exception reports. For cross-departmental projects, the authorized department should uniformly determine the depth of the re-evaluation to avoid having two sets of criteria coexisting for the same project. This page does not provide any pricing formulas, markup percentages, cost figures, or pricing thresholds; the descriptions already present in the original text remain unchanged.

Changes to Trigger Conditions and the Scope of Re-evaluation

  • Any change will trigger a reassessment.
  • Determine whether historical conclusions are applicable.
  • The scope of impact and conclusions remain the same.
  • Clearly state the conditions for restoration.
  • Cross-references with the exception record.
  • Avoid having two sets of criteria operating in parallel.

Comparison of Governance Dimensions

Comparing the cost structure with the focus areas, sources of information, and record-keeping methods of business governance helps quickly identify gaps in policies or records that need to be addressed during an audit. The table below is intended solely for qualitative classification and does not replace the conclusions of an audit or approval process.

The table does not provide any formulas, temperatures, times, pressures, quantities, or acceptance criteria. Actual conclusions must be jointly confirmed based on the supplier’s data sheets, on-site operating procedures, applicable standards, contracts, and local regulations, and must be reviewed by personnel with the appropriate qualifications before being filed. The purpose of the table is to ensure that no management items are overlooked; it is not intended to replace any round of actual review or validation. This page does not provide any quotation formulas, markup percentages, cost figures, or pricing thresholds; the original text has been retained verbatim.

Comparison of Governance Dimensions

  • The form is used for the initial screening review.
  • It is merely a qualitative classification.
  • This is not a substitute for actual verification.
  • No values are provided.
  • The documents and regulations shall prevail.
  • The review findings must be filed.

Client Review and Delivery Checklist

It is recommended to verify, item by item, the definitions of terms related to cost structure and business governance, the versions of relevant documents, supplier information, lists of regulations, personnel authorizations, record-keeping ledgers, review records, outsourcing responsibilities, exemptions from approval, and re-evaluation conclusions. For welding standards, please refer toPCBA Soldering Standards。

The checklist should retain the verification conclusions and descriptions of discrepancies for each round as a basis for revising the system. This approach advances management from “filling in records only when asked” to a system characterized by “clear criteria, defined responsibilities, and traceable processes,” and also enables the rapid identification of specific steps during client audits or internal traceability reviews. For cross-departmental projects, it is recommended that a single checklist be used as a delivery baseline shared by all three parties, with the effective version clearly indicated. This page does not provide any pricing formulas, markup percentages, cost figures, or pricing thresholds; all descriptions from the original text remain unchanged.

Client Review and Delivery Checklist

  • Go over the specifications and documentation item by item.
  • Ensure that all statutory authorizations and records are thoroughly reviewed.
  • Review the exemption from outsourcing in conjunction with the verification.
  • The conclusions of the re-evaluation must be consistent.
  • Description of the discrepancy write-back system.
  • The three parties share a single baseline.

Frequently Asked Questions on Cost Structure, Business Governance, and Compliance Management

1. Why is it important to standardize the terminology first?

Because the same term often carries different underlying assumptions in the design, procurement, production, and inspection phases, failure to align these assumptions in advance can easily lead to conclusions that are correct from each party’s perspective but mutually contradictory. It is recommended to establish a terminology cross-reference table that specifies the applicable scope, the version of the reference document, and the approving authority, with obsolete terms archived separately. This page does not provide any pricing formulas, markup percentages, cost figures, or pricing thresholds; all descriptions from the original text remain unchanged.

2. Why should data and information be based on controlled versions?

Since requirements for documents with the same name may vary across different versions, referencing them by name alone may compromise comparability. It is recommended to record the document number, version number, effective date, and approver, and to archive superseded versions separately; the order of precedence for applicable standards, customer specifications, and internal documents should be specified in advance in the contract.

3. How should safety and environmental protection obligations be incorporated into documents?

It is recommended to establish a list of applicable regulations, documenting the names, versions, effective dates, responsible functions, and review milestones, and to cross-reference compliance conclusions with procurement and delivery documents; occupational safety and waste disposal shall be governed by on-site controlled documents, supplier data sheets, and local regulations. This page does not provide any quotation formulas, markup percentages, cost figures, or pricing thresholds; the original text has been reproduced verbatim.

4. What information should the list of authorized personnel include?

It is recommended to specify the positions covered, the scope of authorization, the effective date, the approval functions, and the review points, and to clearly identify revoked authorizations. Revoke permissions promptly when personnel are reassigned or a project ends. Matters involving security and regulatory interpretation should be handled by personnel with the appropriate authority; this page does not provide any methods for qualification determination or decision-making thresholds.

5. What fields should the ledger include?

This should include the time of discovery, the stage at which it was discovered, the sample identification, the version of the reference document, the positions responsible for execution and review, the conclusion category, the anomaly ticket number, and the resolution status, and should be linked to the batch, work order, and report numbers. The fields should focus on traceable information rather than recording any reusable conditions. This page does not provide any pricing formulas, markup percentages, cost figures, or pricing thresholds; the descriptions already present in the original text remain unchanged.

6. Under what circumstances should a re-evaluation be initiated?

Any change to the version of the documentation, the supplier, the applicable regulations, or the supporting documents should trigger a targeted re-evaluation to confirm whether the previous conclusions remain valid. It is recommended to document the changes, their scope of impact, the re-evaluation conclusions, and the conditions for reinstatement to avoid having two sets of supporting documentation coexisting for the same project.

7. Why should the scope of responsibility for outsourced work be included in the agreement?

Since verbal agreements cannot be traced back after a version update or personnel changes, it is recommended to clearly specify the scope of delivery, the compliance documentation accompanying the shipment, the procedures for reporting deviations, and prohibited actions, and to require the other party to provide written notification of any changes to document versions. Documents of unknown origin should not be included in the controlled document system.

8. What should be included in the delivery checklist prior to client review?

Recommendations should include terminology definitions, applicable versions, supplier information, a list of regulations, personnel authorizations, record-keeping logs, review records, outsourcing responsibilities, exemptions from approval, and re-evaluation conclusions. For each round, retain the verification conclusions and descriptions of discrepancies, and update the management system accordingly. This page does not provide any pricing formulas, markup percentages, cost figures, or pricing thresholds; the descriptions already present in the original text remain unchanged.

Further Reading:Design and Fabrication Methods for Multi-Stage Blind Orifice Plates · Electrical Safety Clearances