Printed circuit boards (PCBs) are core components of modern electronic devices and play a crucial role in a wide variety of equipment. Whether it’s your smartphone, laptop, or home appliance, PCBs serve to connect and support electronic components. In this article, we will delve into various aspects of printed circuit boards, from basic concepts to design considerations, as well as the importance of electrical interconnections.

I. General Vocabulary
To better understand the world of PCB design, let’s first familiarize ourselves with some important terms related to it.
- Printed Circuit (printed circuit): A conductive circuit formed on an insulating substrate using a printing process.
- Printed Wiring: Conductors or circuits on a printed circuit board.
- Printed Circuit Board (PCB): General terminology for printed circuit boards.
- Printed Circuit Board (PCB): An electronic circuit board manufactured using a printing process, used to support and connect electronic components.
- Printed Wiring Board (PWB): Another common term, often used interchangeably with PCB.
- Printed component: Passive or active components printed on a PCB, such as resistors, capacitors, and integrated circuits.
- Printed contact: Connection points on a PCB used to connect electronic components.
- Printed Circuit Board Assembly: The process of mounting components onto a PCB.
- Board: Common alternative names for PCBs.
- Single-sided printed circuit board (SSB): A PCB with a printed circuit pattern on only one side.
- Double-sided printed circuit board (DSB): A PCB with printed circuits on both sides.
- Multilayer Printed Board (MLB): A PCB with multiple printed circuit layers, typically used for complex circuits.
- Multilayer Printed Circuit Board (MLPCB): Another term for multilayer PCBs.
- Multilayer Printed Wiring Board: Another name for multilayer PWBs.
- Rigid Printed Circuit Board (RPCB): PCBs are typically made from rigid substrates.
…
These are some key terms in PCB design; understanding them will help you better grasp the entire process.
II. Base Material
The substrate is a critical component of a PCB, as it determines the PCB’s physical and electrical properties. The following are some terms related to PCB substrates:
- Base Material: The insulating material that forms the main body of a PCB is typically a composite material.
- Laminate: A PCB panel consisting of a substrate and a layer of copper foil applied to its top and bottom surfaces.
- Metal-clad base material: PCB material with a layer of metal foil coated onto the substrate.
- Copper-Clad Laminate (CCL): Laminates with a copper-clad layer, typically used to manufacture double-sided or multilayer PCBs.
- Rigid substrate: Substrates used in the manufacture of rigid PCBs, such as FR-4.
- Flexible substrate: Used in the manufacture ofFlexible PCBsubstrates, such as polyimide (PI).
The choice of substrate depends on the PCB's application and performance requirements. Rigid PCBs are typically used in general-purpose electronic devices, while flexible PCBs are often used in applications that require bending or have unique shapes, such as flexible displays.
III. Printing Process
PCB manufacturing involves several key process steps. Here are some of the terms associated with them:
- Etching: Excess copper foil is removed through a chemical etching process to form the desired circuit pattern.
- Drilling: Drilling holes in a PCB to mount components or establish electrical connections.
- Printing: Print conductive ink onto a substrate to form circuit patterns.
- Surface Finish: A coating is applied to the surface of the PCB to improve solderability and corrosion resistance.
- Soldering: Solder the components onto the PCB to establish an electrical connection.
- Mask: Used to define the areas to be etched and soldered, ensuring precise circuit patterns.
- Printed Resistor: A resistive component created on a PCB using a special printing technique.
IV. Design Considerations
When designing a PCB, there are several key points to consider:
- Schematic Design: Create a circuit diagram to define components and connections.
- PCB Layout Design: Converting a circuit diagram into a physical layout on a PCB, including component placement and connection traces.
- Component Selection: Select components suitable for the application, taking into account their size, electrical characteristics, and availability.
- Electrical Specifications: Define the electrical characteristics of a circuit, such as voltage, current, and signal speed.
- Thermal Management: Ensure that the components on the PCB do not overheat during normal operation.
- EMI/RFI Management: Reduce electromagnetic interference and radio frequency interference to ensure circuit stability.
- Mechanical Compatibility: Consider the compatibility of the PCB with the enclosure or other mechanical components.
V. Electrical Interconnections
Electrical interconnection is one of the core functions of a PCB; it involves how individual components are connected to achieve the circuit’s objectives. The following are some terms related to electrical interconnection:
- Trace: Metal traces on a PCB used to connect components.
- Through-hole (via): A hole that passes through a PCB layer, used to connect conductors on different layers.
- Connector: A component used to connect a PCB to other electronic devices.
- Routing: Planning the path of a wire from one component to another.
- Power Plane: An internal PCB layer used to transmit power signals.
- Ground plane: An internal PCB layer used to transmit ground signals.
- Signal Integrity: A key factor in ensuring that signals are not degraded as they travel across the PCB.
- Impedance Matching: Adjust the characteristic impedance of the cable to meet the requirements between the signal source and the load.
The design of electrical interconnects must take into account factors such as signal transmission speed, interference suppression, and power distribution to ensure circuit performance and reliability.
Conclusion
Printed circuit board (PCB) design encompasses a wide range of concepts and terminology, from substrate materials and manufacturing processes to circuit layout and electrical interconnections. Understanding these terms and concepts is essential for the successful design and manufacture of PCBs. As technology continues to advance, PCB design is constantly evolving to meet the demands of increasingly complex electronic devices. We hope this article will help you better understand the fundamentals and key points of PCB design.
Terminology Standards and Documentation Governance Terminology Standards
Classifying and standardizing terminology and terms related to document governance by concept is more conducive to review alignment than continuing to use customary terms; please refer to the standard guidelines for clarification.EMI Design Specifications and Control Principles。
The same term often carries different default assumptions across the design, procurement, production, and inspection phases; without prior alignment, it is easy for all parties to arrive at conclusions that are correct in their own right but mutually contradictory. It is recommended to establish a terminology cross-reference table that specifies the scope of application, the version of the reference document, and the responsible party for verification, while retaining obsolete terms in a separate archive. This page does not provide any rules for terminology determination, methods for expanding the glossary, or software configuration settings; the original text has been reproduced verbatim without any omissions.

- Classify by concept and assign uniform names.
- The default assumptions differ across the various stages.
- The cross-reference table specifies the basis and functions.
- Invalid names are kept on file separately.
- Comparisons are only valid when the criteria are consistent.
- This article does not provide operating conditions.
Document and Version Control
Requirements for tasks or test documents with the same name may vary across different versions; executing them based on name rather than version will result in a loss of comparability. For standard compilation, please refer toCommon IPC Standards for Printed Circuit Boards。
It is recommended that document numbers, version numbers, effective dates, and approvers be retained in the records, and that redistribution permissions be restricted; only the currently valid version should be kept on-site, while obsolete versions should be stored separately. Applicable standards, customer specifications, and internal operating documents belong to different levels of hierarchy; the order of precedence in the event of a conflict should be specified in advance in the contract or technical agreement. This page does not provide any rules for terminological determination, methods for expanding the glossary, or software settings; the descriptions already present in the original text remain unchanged.

- Versions with the same name may differ.
- No., Version, Date, Approver—all recorded.
- Only the currently valid version will remain on-site.
- Standard customer component hierarchy.
- Priorities are agreed upon in advance.
- The conclusion does not change depending on who cites it.
Supplier Data Sheet and Responsibility Interface
Performance and safety information related to terminology standards and document governance should be derived from controlled documentation provided by the supplier, rather than from anecdotal experience or visual impressions. For regulatory guidance, please refer toWhat is RoHS?。
It is recommended to record the name, version, effective date, responsible department, and approver of each document, and to cross-reference them with the procurement specifications and acceptance criteria. When a document is updated or a supplier is changed, the authorized department shall assess the scope of impact and initiate a re-evaluation. This page does not provide any rules for defining terms, methods for expanding the glossary, or software settings; the descriptions already present in the original text remain unchanged.

- The information is derived from controlled sources.
- Name, Version, Date, Approver—all recorded.
- Cross-reference with the procurement specifications and acceptance criteria.
- Updates to the data trigger a re-evaluation.
- The data tables and regulations shall prevail.
- This article does not specify any terms of use.
Safety, Environmental Protection, and Applicable Regulations
On-site obligations related to terminology consistency and document governance should be verified separately in accordance with applicable laws and local regulatory requirements; external practices cannot be applied directly. For guidance on interpreting standards, please refer toA Comprehensive Overview of Common Printed Circuit Board Standards。
It is recommended to establish a list of applicable regulations that records the regulation name, version, effective date, responsible functions, and review milestones, and to cross-reference compliance conclusions with procurement and delivery documents. Matters such as occupational protection, waste disposal, and information disclosure shall be governed by on-site controlled documents, supplier data sheets, and local regulations, and shall be reviewed by appropriately qualified personnel before being filed. This page does not provide any rules for term determination, methods for expanding the glossary, or software settings; the descriptions already present in the original text remain unchanged.

- The list of regulations is maintained separately.
- Specify the version date and responsibilities.
- Compliance conclusions and procurement are interrelated.
- Refer to the on-site documentation for safety precautions.
- Verify and file the records of qualified personnel.
- This article does not provide operating conditions.
Staff Authorization and Position Qualifications
Personnel who access controlled information, make decisions regarding terminology standards and document management, or sign off on records must have explicit authorization; for guidance on reliability statements, please refer toPCB Reliability Design: DfR Principles and Applications。
It is recommended to maintain an authorization list that records job titles, scope of authorization, effective dates, approving authorities, and review points, with revoked authorizations clearly marked. Revoke permissions promptly when personnel are reassigned or a project ends. Matters involving safety and regulatory interpretation should be handled by personnel with the appropriate authority; this document does not provide any methods for qualification determination, training content, or assessment thresholds. This page does not provide any rules for defining terminology, methods for expanding glossaries, or software configuration settings; the descriptions already present in the original text remain unchanged.

- The list of authorized personnel is maintained by position.
- Scope, dates, and approval authority are recorded together.
- Revoke access privileges promptly once the job reassignment is complete.
- Separate label for revoked authorizations.
- Security explanations are provided by the authorized department.
- This article does not provide a threshold for determination.
Record Fields and the Chain of Custody
The value of records related to terminology standards and document governance lies in their traceability; fields should be based on management information, and reference materials for public outreach can be consulted.A Guide to PCB Materials。
It is recommended to record the time of discovery, the stage at which it was discovered, the sample identification, the version of the reference document, the positions responsible for execution and review, the conclusion category, the anomaly report number, and the disposition status, and to link these to the batch, work order, and report numbers. The disposition conclusion must be confirmed in writing by an authorized official, and the recipient’s acknowledgment must be filed. This page does not provide any rules for term determination, methods for expanding the glossary, or software settings; the descriptions already present in the original text remain unchanged.

- The field is located in the traceability information.
- The date of discovery is recorded alongside the specimen.
- Retain based on version and position.
- Disposition is confirmed by the authorized function.
- The acknowledgment and the re-evaluation conclusion cross-reference each other.
- This article does not provide instructions on how to proceed.
Review Records and Conclusions Are Traceable
The value of reviews related to terminology consistency and document governance lies in producing traceable conclusions, rather than merely reaching verbal agreements on the spot.
It is recommended that review records include the topic, participating functions, the version of the reference document, conclusions, outstanding items, and closure status, and that they cross-reference the glossary and record ledger. For items on which consensus was not reached, the responsible party and the date for re-evaluation should be specified to prevent the issue from recurring in a different form in the next delivery cycle; relevant records should be archived by project and version, and invalidated conclusions should be clearly marked. This page does not provide any rules for terminology determination, methods for expanding glossaries, or software settings; the descriptions already present in the original text remain unchanged.

- The review results in traceable conclusions.
- The basis for the agenda items is the same.
- The conclusions and outstanding issues are listed side by side.
- Write the responsibilities and tasks for pending items.
- Several lists reference each other.
- Invalid conclusions should be marked separately.
Outsourcing Agreement with Suppliers
Clearly define the boundaries of responsibility among external partners, suppliers, and internal functions regarding terminology standards and document management to avoid gaps where no one is responsible for verification. Management guidelines can be referenced as follows:Management Guidelines for 5G PCBs。
It is recommended that the agreement specify the scope of delivery, compliance documentation accompanying the goods, procedures for reporting deviations, prohibited actions, and principles for handling breaches of contract, and require the other party to provide written notice of any changes to document versions. Any delivery beyond the agreed scope may only be accepted after written confirmation by the authorized function; documents of unknown origin shall not be included in the controlled document system nor used as the basis for acceptance. This page does not provide any rules for defining terms, methods for expanding the glossary, or software settings; the descriptions already present in the original text remain unchanged.

- The scope of responsibility is specified in the agreement.
- The scope of delivery and compliance documentation are clearly defined.
- Any deviation from the standard notification method must be agreed upon.
- Any changes to the information must be notified in writing.
- Deliveries made beyond one's authority require authorization and confirmation.
- Items of unknown origin are not accepted for control.
Exceptions and Exemptions from Approval
When field conditions are limited, there are always exceptions to established rules regarding terminology consistency and document management; the key is to turn those exceptions into verifiable, written conclusions.
It is recommended to establish an exemption record that covers the reason for the request, scope of application, scope of impact, basis for substitution, approval authority, and re-evaluation milestones, and that cross-references the review record. An exemption does not constitute permanent approval; when subsequent versions of documentation, suppliers, or supporting documents change, a reassessment should be conducted to determine whether the historical conclusion remains applicable. This page does not provide any rules for term determination, methods for expanding the glossary, or software settings; the descriptions already present in the original text remain unchanged.

- Exceptions due to time constraints are inevitable.
- Exceptions must be documented in writing.
- Record the reason, scope, and basis.
- The approval functions and re-evaluation milestones are specified.
- Cross-references to the review records.
- Do not provide a value for the alternative condition.
Changes to Trigger Conditions and the Scope of Re-evaluation
Any change to the data version, supplier, applicable regulations, or supporting documentation should trigger a targeted re-evaluation of terminology consistency and document governance-related conclusions.
The value of a re-evaluation lies in confirming whether historical conclusions remain valid, rather than redoing the entire record from scratch. It is recommended to document changes, their scope of impact, re-evaluation conclusions, and conditions for restoration, and to cross-reference these with the original evaluation records and non-conformance reports. For cross-departmental projects, the authorized department should uniformly determine the depth of the re-evaluation to avoid having two sets of criteria coexisting for the same project. This page does not provide any rules for term determination, methods for expanding glossaries, or software configuration settings; the descriptions already present in the original text remain unchanged.

- Any change will trigger a reassessment.
- Determine whether historical conclusions are applicable.
- The scope of impact and conclusions remain the same.
- Clearly state the conditions for restoration.
- Cross-references with the exception record.
- Avoid having two sets of criteria operating in parallel.
Comparison of Governance Dimensions
Aligning terminology definitions with the scope of document management—including its focus, sources of authority, and record media—helps quickly identify gaps in policies or records that need to be addressed during an audit. The table below provides only a qualitative classification and does not replace the conclusions of an audit or approval process.
The table does not provide any formulas, temperatures, times, pressures, quantities, or acceptance criteria. Actual conclusions must be jointly confirmed based on the supplier’s data sheets, on-site operating procedures, applicable standards, contracts, and local regulations, and must be reviewed by personnel with the appropriate qualifications before being filed. The purpose of the table is to ensure that no management items are overlooked; it is not intended to replace any round of actual review or validation. This page does not provide any rules for defining terms, methods for expanding the glossary, or software settings; the descriptions already present in the original text remain unchanged.
| Subject of Focus | Source | Recording Medium |
|---|---|---|
| Terminology and Versions | Standards and Documents | Cross-Reference Table and Version Log |
| Resources and Regulations | Data Tables and Lists | Source Ledger and List of Regulations |
| Authorization and Record-Keeping | Positions and Reporting | List of Authorizations and Record-Keeping Ledger |
| Review and Changes | Review and Approval | Review Records and Re-evaluation Conclusions |

- The form is used for the initial screening review.
- It is merely a qualitative classification.
- This is not a substitute for actual verification.
- No values are provided.
- The documents and regulations shall prevail.
- The review findings must be filed.
Client Review and Delivery Checklist
It is recommended to verify, item by item, the definitions of terms related to document control, including the basis for versioning, supplier information, lists of regulations, personnel authorizations, record ledgers, review records, outsourcing responsibilities, exemptions from approval, and re-evaluation conclusions. For welding standards, please refer toPCBA Soldering Standards。
The checklist should retain the verification conclusions and descriptions of discrepancies for each round as a basis for revising the system. This approach advances management from “filling in records only when asked” to a system characterized by “clear guidelines, defined responsibilities, and traceable processes,” and also enables the rapid identification of specific steps during client audits or internal traceability reviews. For cross-departmental projects, it is recommended that a single checklist be used as a delivery baseline shared by all three parties, with the effective version clearly indicated. This page does not provide any rules for defining terminology, methods for expanding the glossary, or software configuration settings; the descriptions already present in the original text remain unchanged.

- Go over the specifications and documentation item by item.
- Ensure that all statutory authorizations and records are thoroughly reviewed.
- Review the exemption from outsourcing in conjunction with the verification.
- The conclusions of the re-evaluation must be consistent.
- Description of the discrepancy write-back system.
- The three parties share a single baseline.
Frequently Asked Questions on Terminology Standards and Document Governance Compliance Management
1. Why is it important to standardize the terminology first?
Because the same term often carries different underlying assumptions in the design, procurement, production, and inspection phases, failure to align these assumptions in advance can easily lead to conclusions that are correct from each party’s perspective but mutually contradictory. It is recommended to establish a terminology cross-reference table that specifies the applicable scope, the version of the reference document, and the approving authority, while retaining obsolete terms in a separate archive. This page does not provide any rules for terminology determination, methods for expanding the glossary, or software settings; the original text has been reproduced verbatim without any omissions.
2. Why should data and information be based on controlled versions?
Since requirements for documents with the same name may vary across different versions, referencing them by name alone may compromise comparability. It is recommended to record the document number, version number, effective date, and approver, and to archive superseded versions separately; the order of precedence for applicable standards, customer specifications, and internal documents should be specified in advance in the contract.
3. How should safety and environmental protection obligations be incorporated into documents?
It is recommended to establish a list of applicable regulations, documenting the names, versions, effective dates, responsible functions, and review milestones, and to cross-reference compliance conclusions with procurement and delivery documents; occupational safety and waste disposal shall be governed by on-site controlled documents, supplier data sheets, and local regulations. This page does not provide any rules for term determination, methods for expanding the glossary, or software settings; the descriptions already present in the original text remain unchanged.
4. What information should the list of authorized personnel include?
It is recommended to specify the positions covered, the scope of authorization, the effective date, the approval functions, and the review points, and to clearly identify revoked authorizations. Revoke permissions promptly when personnel are reassigned or a project ends. Matters involving security and regulatory interpretation should be handled by personnel with the appropriate authority; this page does not provide any methods for qualification determination or decision-making thresholds.
5. What fields should the ledger include?
This should include the time of discovery, the stage at which it was discovered, the sample identification, the version of the reference document, the positions responsible for execution and review, the conclusion category, the anomaly ticket number, and the disposition status, and should be linked to the batch, work order, and report numbers. The fields should focus on traceable information rather than recording any reusable conditions. This page does not provide any rules for defining terms, methods for expanding the glossary, or software configuration settings; the descriptions already present in the original text remain unchanged.
6. Under what circumstances should a re-evaluation be initiated?
Any change to the version of the documentation, the supplier, the applicable regulations, or the supporting documents should trigger a targeted re-evaluation to confirm whether the previous conclusions remain valid. It is recommended to document the changes, their scope of impact, the re-evaluation conclusions, and the conditions for reinstatement to avoid having two sets of supporting documentation coexisting for the same project.
7. Why should the scope of responsibility for outsourced work be included in the agreement?
Since verbal agreements cannot be traced back after a version update or personnel changes, it is recommended to clearly specify the scope of delivery, the compliance documentation accompanying the shipment, the procedures for reporting deviations, and prohibited actions, and to require the other party to provide written notification of any changes to document versions. Documents of unknown origin should not be included in the controlled document system.
8. What should be included in the delivery checklist prior to client review?
Recommendations should include terminology definitions, reference versions, supplier information, a list of regulations, personnel authorizations, record-keeping logs, review records, outsourcing responsibilities, exemptions from approval, and re-evaluation conclusions. For each round, retain the verification conclusions and descriptions of discrepancies, and update the management system accordingly. This page does not provide any rules for defining terms, methods for expanding the glossary, or software configuration settings; the descriptions already present in the original text remain unchanged.
Related Recommendations:13 Rules for Laying Out Components on Printed Circuit Boards · 34 Common IPC Standards for Printed Circuit Boards
