In the surface-mount technology (SMT) process, handling exceptions is critical. Our goal is to effectively track and resolve exceptions in the SMT process, clarify the responsibilities of relevant departments, and improve the efficiency of exception handling, thereby reducing customer complaints.

Definition
- Surface-mount: In electronics manufacturing, surface-mount assembly is the process of attaching electronic components to a printed circuit board (PCB).
- SMT AssemblyProcessing Anomalies: Issues caused by factors such as SMT equipment parameters, raw materials, or design errors that result in process control failures, lower-than-expected production efficiency, or product quality that does not meet standards are collectively referred to as surface mount process anomalies.
Advanced: SMT exceptions can be classified into five categories based on their source
The original text outlines the process for handling anomalies based on “responsible departments,” but during on-site investigations, another approach proves more practical—Classified by the Source of the Exception. Anomalies from different sources vary in terms of their location, observable characteristics, and fundamental solutions:
| Source | Typical Symptoms | Department | Fundamental Solutions |
|---|---|---|---|
| Design for Manufacturing (DFM) | Batch soldering, offset, and continuous soldering for a certain package | Research and Development Department | Modifying Pads and Layout |
| Incoming Materials | Component oxidation, pin deformation, PCB warping | SQE / Supplier | Change the batch, strengthen IQC |
| Equipment | Increased scrap rate, placement misalignment, nozzle clogging | Engineering Department / Plant | Maintenance, Calibration, and Parts Replacement |
| Process Parameters | An improper furnace temperature profile can cause cold solder joints and insufficient solder. | Engineering Department | Re-measure the temperature curve and adjust the parameters |
| Resources | Gerber Layer Missing, Coordinate File Misalignment | Research and Development Department / NPI | Update File Version |
The value of categorization lies inAvoid treating all anomalies as "production line issues". Statistically, issues related to incoming materials and design often account for the lion's share, but because they manifest as "production line defects," they are easily misidentified as operational or equipment problems, leading to repeated machine adjustments that yield no results.
- Examining the Temporal Distribution of Non-Performing Loans: Sudden fluctuations are usually caused by incoming materials or equipment, while consistently high levels are typically due to design or process issues;
- Examining the Spatial Distribution of Non-Compliance: A concentration of components at a specific component location is usually due to design or tape-and-reel issues, while a scattered distribution is typically due to parameter issues;
- Identifying Unfavorable Patterns: Solder wick deviation is related to the solder amount and parameters, while the deviation from the design is related to the thermal balance of the pads.
- First, record the part numbers, quantities, and types of defective items;
- Classify under a specific source according to the table above;
- Forward this to the department responsible for this type of issue to conduct a root cause analysis;
- Develop measures and track their implementation.

For an overview of the surface-mount process, seeSMT Assembly; For an analysis of welding defects, seeAnalysis of the Causes of Soldering Defects on Printed Circuit Boards。
Responsibilities
To effectively address anomalies in the SMT assembly process, each department is responsible for the following duties:
- Engineering Department: Analyze the causes of the anomalies and propose recommendations for improvement.
- Research and Development Department: Revise the design to address manufacturability issues.
- Quality Assurance Department: Provide quality data reports, handle complaints, and assign responsibility.
- Quality Planning Department: Assist in tracking issue resolutions and phase control, and drive process improvements.
- After-Sales Service Department: Respond to customer inquiries and investigate the status of customer products.
- Project Management Department: Coordinate with project team members, drive problem-solving, and ensure the project stays on schedule.
Abnormal Process Flows Caused by Design for Manufacturability
If the anomaly is caused by design for manufacturability
- List of Questions: The outsourcing factory summarized the issues in a trial production report and sent it to the project team.
- 由Engineering DepartmentConfirm whether changes are needed, and send toResearch and Development DepartmentProvide feedback.
- Amendments and Implementation: 2.1. Research and Development DepartmentNo objections: The R&D Department will implement the changes,Quality PlanTrack the progress of revisions; the project manager is responsible for reviewing and approving them. 2.2. In case of a dispute: The project manager and the quality planning team will evaluate and resolve the issue.
Handling Exceptions During Production
Detection of Abnormal Processes
- Confirm Production Line Status: When an anomaly is detected, XX Plant’s NPI team must promptly verify the production line status.
- Report a Problem: The PQE department provides a feedback form for reporting issues at subcontracting factories.
- Findings and Recommendations: The project team evaluates the feedback and proposes improvements. PQE decides whether to continue production or halt it.
Exception Classification and Handling
2.2.1. Handling Process Anomalies Caused by Defective Incoming Materials
- Submit Error Report: Process abnormalities caused by nonconforming incoming materials are to be reported by the PQE at XX Plant, who will notify the SQE to contact the supplier to implement corrective actions.
- Analysis of the Causes of Defective Incoming Materials: The on-site PQE provides guidance to contract manufacturers and suppliers on analysis and presents the results of those analyses.
- The results are consistent: The project provides a risk assessment recommendation, and the PQE decides whether to modify the data or proceed with production.
- Inconsistent results: The project team analyzed the issue based on the error message, and the PQE coordinated with the SQE to resolve it.
2.2.2. Process Anomalies Caused by Missing Processing Technical Data
- Missing Data in Gerber Files: The NPI Notification Project Team, based at headquarters, will have the R&D Department send the updated documents to the contract manufacturers, and the New Product Introduction Department will follow up to ensure the issues are resolved.
- Missing Process Control Items: Send the Shanghai NPI upgrade documents to the subcontracting factory and dispatch an NPI supervisor to oversee the subcontracting factory’s process adjustments.
2.2.3. Process Anomalies Caused by SMT Equipment Issues
- Decline in Equipment Efficiency: The SMT equipment at the outsourcing factory had not been maintained or upgraded for a certain period of time, so the engineering team stepped in to evaluate the equipment’s performance and determine its performance metrics (CPK).
- Unexpected Equipment Failure: Equipment failures during production are managed by the subcontracting factory.
2.2.4. Processing Errors Caused by SMT Placement Errors
2.2.5. Troubleshooting Process Abnormalities Caused by Screen Aperture Patterns
2.2.6. Handling Process Anomalies Caused by Auxiliary Fixtures
- Outsourced factories proofread and adjust auxiliary jigs; the project team provides requirements and evaluation feedback; and PQE addresses quality issues.
Process for Handling Complaints Regarding Process Irregularities
Complaints Regarding Process Anomalies
- Analysis of the Causes: The Engineering Department and the R&D Department will analyze the causes and nature of the anomalies.
- Coordinated Handling: The Quality Planning Department coordinates and follows up on complaint cases until the root cause is resolved.
- Improvement Measures: Based on R&D and engineering analyses, the PQE guides contract manufacturers in proposing improvement measures and tracks the resolution of issues. If third-party validation is required, the PQE coordinates with the contract manufacturers and provides analytical reports.
Process for Handling Internal Complaints
Handling Complaints Regarding Abnormalities in the R&D and Debugging Process
- The R&D Department conducts a qualitative analysis of functionality and signals, retains defective samples, and submits a quality plan. The Quality Plan team coordinates with Engineering to analyze and evaluate the findings.
Handling Complaints Regarding Process Anomalies During the Complete Unit Assembly Phase
- The After-Sales Service team is responsible for collecting backend information; the PQE compiles production data from contract manufacturers; and the project team is responsible for analyzing and evaluating the data.
Advanced: Four Critical Points in Exception Handling
The original text outlines the complete process, from discovery and classification to complaints and customer feedback. To ensure this process truly functions effectively, there are four key points where the chain is most likely to break, and separate safeguards must be put in place at each of these points:
| Node | Common Signs of a Broken Link | Control Measures |
|---|---|---|
| Discovery | The abnormality was not documented; it disappeared after being communicated verbally. | Mandatory Completion of the Exception Report Form |
| Determining Liability | Departments pass the buck to one another; no one takes responsibility | Set a Time Limit for Assigning Liability and a Default Liable Party |
| Measures | Only temporary solutions, no permanent measures | Requires a distinction between temporary and permanent measures |
| Close | The measures have not been verified, and the problem keeps recurring. | The system will only be shut down after three consecutive batches show no abnormalities. |
Among these, “assigning responsibility” is the most likely to be delayed. A practical approach is to setDefault Party Liable + Appeal Mechanism: First, assign the issue to a specific department based on its source. If that department believes the issue is not within its purview, it must provide evidence and transfer the case within the specified timeframe, rather than waiting for a consensus. This approach can reduce the average resolution time by more than half.
- Temporary Measures: Control the release of the current batch, such as by implementing stricter 100% inspection or selective use;
- Permanent Measures: Address the root causes, such as modifying the pads, changing suppliers, or revising the work instructions;
- Horizontal Expansion: Extend these measures to similar products and machines to prevent recurrence elsewhere;
- Standardization: Incorporate effective measures into documents and checklists, turning them into routine actions.
- Complete a preliminary determination of liability within 24 hours of the incident;
- Propose interim measures and resume production within 48 hours;
- Submit a root cause analysis and permanent corrective actions within 7 business days;
- After three consecutive batches were verified and found to be free of anomalies, the process was officially closed and archived.

For testing and screening methods, seePCBA Testing; For details on assembly capabilities, seePCBA Assembly Capabilities。
Customer Complaint Handling Process
Exception Information Collection and Display
- The after-sales team is responsible for collecting and responding to customer inquiries, providing detailed descriptions of the customer's steps, and including images and explanatory text.
- PQE organizes meetings to determine whether the reasons for customer complaints are valid and whether the complaint requests are reasonable.
- If the reason is valid, PQE will urge the outsourcing factory to conduct an audit and submit a plan for improvement, which the project team will then approve.
- If the grounds for the complaint are invalid or unclear, the R&D department will conduct a qualitative analysis of the functionality and signals and provide a conclusion.
Advanced: Preventing Issues Before Production—Data Completeness Checks
The original text specifically lists “process abnormalities caused by missing processing technical data”; such issues can, in essence, be completely avoided in advance. The list of documents that should be verified prior to production is as follows:
- Gerber Files: Includes all layers of circuit traces, solder mask, screen printing, and drilling; the version has been confirmed as consistent with the board manufacturer’s;
- Coordinate File: Include the component part number, X/Y coordinates, rotation angle, and the plane it is located on; specify the units and origin;
- BOM List: Includes pin number, part number, specifications, package type, and substitute part information;
- Assembly Drawings and Special Requirements: Polarity, no-mount zones, dispensing, and anti-corrosion requirements;
- Steel Mesh Documents: Hole-drilling methods and thickness requirements, especially for fine-pitch components.
The most common source of errors on the list isOrigin and Units of Coordinate Files. For the same design file, whether the coordinate origin is set at the lower-left corner or the center of the board, or whether the units are mils or mm—if even one detail differs from the placement program, it will cause the entire board to shift. Performing a first-article verification before production is the most cost-effective safeguard.
| Data Item | Consequences of a Missing Element | Preliminary Inspection Methods |
|---|---|---|
| Coordinate File | Unable to program; production delayed | Verify against the BOM part numbers one by one |
| BOM Version | Wrong materials, missing materials | Comparison with the Latest R&D Version |
| Steel Mesh Perforations | Low-tin, continuous-tin | Verify Based on the Smallest Component Package |
| Polarity Annotation | Diodes, Electrolytic Capacitors in Reverse Bias | Comparison of the Assembly Drawing and the Actual Product |
| Special Process Requirements | Omitted steps | Explicitly listed on the process card |
For a detailed list of production materials, please refer toWhat information do customers need to provide before SMT assembly?; For an introduction to basic techniques, seeSMT Basics and Characteristics。

Frequently Asked Questions
1. What is the difference between “SMT placement defects” and “soldering defects”?
SMT placement defects occur during the component placement stage and manifest as missing components, incorrect components, misalignment, tombstoning, and flipped components; Soldering defects occur during the reflow stage and manifest as cold solder joints, solder bridges, insufficient solder, and cold solder joints. The causes of these two types of defects differ: the former are often related to the nozzle, component tape, and coordinate system, while the latter are often related to the solder paste, stencil, and oven temperature profile.
2. What does a sudden increase in scrap rate indicate?
This typically points to three possible causes: nozzle wear or clogging, poor feed from the tape feeder, or dimensional deviations in the incoming components. The recommended troubleshooting sequence is to first check the nozzle vacuum level and its appearance, then check the feeder’s stepper motor operation, and finally verify the dimensions of the incoming components. If all three are normal, check whether the placement height and recognition parameters have been modified.
3. Why is confirmation of the first item important?
This is because the first-piece inspection is the final systematic verification before production begins. It can immediately reveal batch-wide issues such as coordinate offsets, incorrect BOM components, reversed polarity, and improper stencil apertures. Skipping the first-piece inspection and proceeding directly to mass production means that any error will result in the entire batch having to be reworked—a cost far greater than the ten or so minutes required for the first-piece inspection.
4. How often should the furnace temperature curve be measured?
It is standard practice to test every board type of a new product before the first mass production run; after mass production begins, retesting is conducted quarterly or whenever there is a line change or a switch to a different solder paste brand. The reflow oven temperature profile directly determines the quality of the solder joints; as a critical process parameter, it cannot be left uncalibrated for extended periods based solely on experience.
5. Do temporary and permanent measures have to be kept separate?
They must be kept separate. The purpose of temporary measures is to stem the problem and keep the production line running; the purpose of permanent measures is to eliminate the root cause. If only temporary measures are implemented, the problem will resurface after a few batches; if production is halted until permanent measures are in place, the losses from the line shutdown will be too great. Implementing both simultaneously is the standard practice.
6. How soon after a customer complaint is it appropriate to respond?
It is standard practice in the industry to provide an initial response (acknowledging receipt and confirming that an investigation has been initiated) within 24 hours, and to deliver a formal analysis report (typically in the 8D format) within 3 to 7 business days. Response speed is, in itself, a key indicator of a supplier’s capabilities in the eyes of clients; it has a greater impact on their perception than the timing of the final conclusion.
7. How can you tell the difference between a cold solder joint and a poor solder joint?
A cold solder joint occurs when the solder pad or pin is not sufficiently wetted by the solder, resulting in poor interfacial bonding; a cold-welded joint occurs when the solder has melted but did not reach a sufficient temperature or was disturbed too early, resulting in a rough, dull crystalline structure. Although the two appear similar, their causes differ: cold solder joints are often caused by oxidation or insufficient flux, while cold solder joints are typically caused by insufficient temperature or vibration.
8. Why is the defect rate higher in lead-free processes?
Lead-free solder has a melting point approximately 34 °C higher than leaded solder, resulting in a narrower process window and placing higher demands on the accuracy of the oven temperature profile, component heat resistance, and the Tg of the PCB substrate. When converting a design from leaded to lead-free, it is necessary to remeasure the temperature profile and evaluate the temperature resistance of the components and the PCB substrate; the original parameters cannot simply be carried over.