What are the different types of laser drilling used in PCB factories?

Published: October 1, 2026 · Updated: October 1, 2026

In the field of PCB (Printed Circuit Board) manufacturing, lasersDrillingLaser technology is a critical process that enables the rapid and precise creation of microscopic holes to meet the demands of high-density circuit layouts in modern electronic products. This article will introduce several common laser drilling technologies used in PCB manufacturing facilities, along with their principles and applications.

Applications of Laser Drilling in HDI Printed Circuit Boards

Basic Principles of Laser Drilling

Laser drilling is a process in which a laser beam is focused onto the surface of a PCB, and the energy of the laser is used to remove the substrate material to be machined. During laser drilling, three main phenomena occur when the beam interacts with the workpiece surface:

  1. Reflection: Part of the light beam is reflected by the surface and does not contribute to the machining process.
  2. Absorption: The material absorbs the energy of the light beam, causing localized heating.
  3. Penetration: A beam passes through the surface of a material and produces an effect within it.

The key role of laser drilling is to utilize the energy of light to remove material through photothermal or photochemical ablation (also known as cutting), thereby forming holes.

Thermal Ablation

Laser ablation is a process in which the material being processed absorbs high-energy laser energy, rapidly heats up to its melting point, and evaporates, forming holes. This method leaves carbonized residue on the hole walls, which must be removed before the holes are formed.

Photochemical Ablation

Photochemical ablation refers to the result of the interaction between a laser with high-energy photons in the ultraviolet region and a material. This high photon energy can break the long molecular chains of organic materials, causing them to decompose into smaller particles that then escape from the material, forming microscopic pores. Unlike photothermal ablation, photochemical ablation does not produce carbonized residue, making cleanup relatively straightforward.

Common Laser Drilling Techniques

In commercial PCB manufacturing, common laser drilling technologies include:

1. CO₂ Gas Laser

CO₂ gas lasers are commonly used for manufacturing micro-holes. They are suitable for applications requiring micro-holes with diameters greater than 100 μm. CO₂ lasers offer high production efficiency because the time required to produce large holes is very short. However, the hole quality may be lower.

2. UV Solid-State Nd:YAG Laser

UV solid-state Nd:YAG lasers are suitable for producing micropores with diameters less than 100 μm; in particular, with the application of miniaturized circuit layouts, pore diameters can be less than 50 μm. This technology offers high throughput for producing small pores but is not suitable for producing large pores.

3. Dual-head laser drilling system

Dual-head laser drilling systems are becoming increasingly popular in commercial PCB manufacturing. They typically include two different types of laser heads—usually an ultraviolet laser head and a CO₂ laser head.

  • The dual-head UV laser drilling system is suitable for creating holes smaller than 90 μm with a high aspect ratio.
  • The dual-head CO₂ laser drilling system uses a Q-switched RF-pumped CO₂ laser and features a high repetition rate, short drilling time, and a wide working area. However, the hole quality may be lower.

4. Hybrid Laser Drilling System

Hybrid laser drilling systems combine the advantages of ultraviolet lasers and CO₂ lasers, enabling simultaneous drilling of copper and dielectric materials. This integrated approach is typically highly efficient in PCB manufacturing.

Factors Affecting Laser Drilling Performance

During the laser drilling process, two key factors affect hole quality and speed:

  1. Laser Energy/Pulse Energy: The laser's power level and pulse energy determine the drilling time and depth. High-energy lasers can penetrate materials more quickly, but excessively high energy may result in poorer hole quality.
  2. Beam Positioning System: The precise positioning of the beam determines its speed of movement. Precise positioning ensures high-quality hole production.

Terminology for Drilling and Equipment Management

Classifying and standardizing terms related to drilling and equipment management by concept is more conducive to review alignment than continuing to use customary terms; please refer to the standard for guidance.EMI Design Specifications and Control Principles。

The same technical term often carries different underlying assumptions across the design, procurement, production, and inspection phases; without prior alignment, it is easy for all parties to arrive at conclusions that are correct in their own right but mutually contradictory. It is recommended to establish a terminology cross-reference table that specifies the applicable scope, the version of the reference document, and the approving authority; obsolete terms should be archived separately. This page does not provide any feed rates, rotational speeds, hole limit values, or parameter setup procedures; the descriptions already present in the original text remain unchanged.

Terminology for Drilling and Equipment Management

  • Classify by concept and assign uniform names.
  • The default assumptions differ across the various stages.
  • The cross-reference table specifies the basis and functions.
  • Invalid names are kept on file separately.
  • Comparisons are only valid when the criteria are consistent.
  • This article does not provide operating conditions.

Document and Version Control

Requirements for tasks or test documents with the same name may vary across different versions; executing them based on name rather than version will result in a loss of comparability. For standard compilation, please refer toCommon IPC Standards for Printed Circuit Boards。

It is recommended that document numbers, version numbers, effective dates, and the name of the approver be retained in the records, and that redistribution be restricted; only the currently valid version should be kept on-site, while obsolete versions should be stored separately. Applicable standards, customer specifications, and internal operating procedures belong to different levels of hierarchy; the order of precedence in the event of a conflict should be specified in advance in the contract or technical agreement. This page does not provide any feed rates, rotational speeds, hole limit values, or parameter setup procedures; the descriptions already present in the original text remain unchanged.

Document and Version Control

  • Versions with the same name may differ.
  • No., Version, Date, Approver—all recorded.
  • Only the currently valid version will remain on-site.
  • Standard customer component hierarchy.
  • Priorities are agreed upon in advance.
  • The conclusion does not change depending on who cites it.

Supplier Data Sheet and Responsibility Interface

Performance and safety information related to drilling and equipment management should be derived from controlled documentation provided by the supplier, rather than from verbal accounts of experience or visual impressions. For regulatory guidance, please refer toWhat is RoHS?。

It is recommended to document the name, version, effective date, responsible department, and approver of the documentation, and to cross-reference it with the procurement specifications and acceptance criteria; when the documentation is updated or the supplier changes, the authorized department shall assess the scope of impact and initiate a re-evaluation. This page does not provide any feed rates, rotational speeds, hole limit values, or parameter setup procedures; the descriptions already present in the original text remain unchanged.

Supplier Data Sheet and Responsibility Interface

  • The information is derived from controlled sources.
  • Name, Version, Date, Approver—all recorded.
  • Cross-reference with the procurement specifications and acceptance criteria.
  • Updates to the data trigger a re-evaluation.
  • The data tables and regulations shall prevail.
  • This article does not specify any terms of use.

Safety, Environmental Protection, and Applicable Regulations

On-site responsibilities related to drilling and equipment management should be verified independently in accordance with applicable laws and local regulatory requirements; reliance on external experience is not permitted. For guidance on interpreting standards, please refer toA Comprehensive Overview of Common Printed Circuit Board Standards。

It is recommended to establish a list of applicable regulations that records the regulation name, version, effective date, responsible functions, and review milestones, and to cross-reference compliance conclusions with procurement and delivery documents. Matters such as occupational safety, waste disposal, and information disclosure shall be governed by on-site controlled documents, supplier data sheets, and local regulations, and shall be reviewed by appropriately qualified personnel before being filed. This page does not provide any feed rates, rotational speeds, hole size limits, or parameter setup procedures; the descriptions already present in the original text remain unchanged.

Safety, Environmental Protection, and Applicable Regulations

  • The list of regulations is maintained separately.
  • Specify the version date and responsibilities.
  • Compliance conclusions and procurement are interrelated.
  • Refer to the on-site documentation for safety precautions.
  • Verify and file the records of qualified personnel.
  • This article does not provide operating conditions.

Staff Authorization and Position Qualifications

Personnel who access controlled information, draw conclusions regarding drilling and equipment management, or approve records must have explicit authorization; for a description of reliability, please refer toPCB Reliability Design: DfR Principles and Applications。

It is recommended to maintain an authorization list that records job titles, scope of authorization, effective dates, approving authorities, and review points, with revoked authorizations clearly marked. Revoke permissions promptly when personnel are reassigned or a project ends. Matters involving safety and regulatory interpretation should be handled by personnel with the appropriate authority; this document does not provide any methods for qualification determination, training content, or decision thresholds. This page does not provide any feed rates, rotational speeds, hole size limits, or parameter setup procedures; the descriptions already present in the original text remain unchanged.

Staff Authorization and Position Qualifications

  • The list of authorized personnel is maintained by position.
  • Scope, dates, and approval authority are recorded together.
  • Revoke access privileges promptly once the job reassignment is complete.
  • Separate label for revoked authorizations.
  • Security explanations are provided by the authorized department.
  • This article does not provide a threshold for determination.

Record Fields and the Chain of Custody

The value of records related to drilling and equipment management lies in their traceability; these fields should be included in management information, and reference can be made to the material overview.A Guide to PCB Materials。

It is recommended to record the time of discovery, the stage at which it was discovered, the sample identification, the version of the reference document, the positions responsible for execution and review, the conclusion category, the nonconformance report number, and the disposition status, and to link these to the batch, work order, and report numbers; the disposition conclusion must be confirmed in writing by an authorized official, and the recipient’s acknowledgment must be filed. This page does not provide any feed rates, rotational speeds, hole limit values, or parameter setup procedures; the descriptions already present in the original text remain unchanged.

Record Fields and the Chain of Custody

  • The field is located in the traceability information.
  • The date of discovery is recorded alongside the specimen.
  • Retain based on version and position.
  • Disposition is confirmed by the authorized function.
  • The acknowledgment and the re-evaluation conclusion cross-reference each other.
  • This article does not provide instructions on how to proceed.

Review Records and Conclusions Are Traceable

The value of reviews related to drilling and equipment management lies in documenting traceable conclusions, rather than merely reaching a verbal agreement on the spot.

It is recommended that review records include the topic, participating functions, the version of the reference document, conclusions, outstanding items, and closure status, and that they cross-reference the glossary and record ledger. For items on which consensus was not reached, the responsible person and the date for re-evaluation should be specified to prevent the issue from recurring in a different form in the next delivery cycle; Relevant records shall be archived by project and version, with invalidated conclusions clearly marked. This page does not provide any feed rates, rotational speeds, hole limit values, or parameter setup procedures; all descriptions already present in the original text remain unchanged.

Review Records and Conclusions Are Traceable

  • The review results in traceable conclusions.
  • The basis for the agenda items is the same.
  • The conclusions and outstanding issues are listed side by side.
  • Write the responsibilities and tasks for pending items.
  • Several lists reference each other.
  • Invalid conclusions should be marked separately.

Outsourcing Agreement with Suppliers

Clearly define the boundaries of responsibility between external contractors, suppliers, and internal functions regarding drilling and equipment management to avoid any gaps where no one is accountable. Management guidelines can be referenced as follows:Management Guidelines for 5G PCBs。

It is recommended that the agreement specify the scope of delivery, compliance documentation accompanying the goods, procedures for reporting deviations, prohibited actions, and principles for handling breaches of contract, and require the other party to provide written notice of any changes to document versions. Any delivery beyond the agreed scope may only be accepted after written confirmation by the authorized function; documents of unknown origin shall not be included in the controlled document system nor used as the basis for acceptance. This page does not provide any feed rates, spindle speeds, hole limit values, or parameter setup procedures; the descriptions already present in the original text remain unchanged.

Outsourcing Agreement with Suppliers

  • The scope of responsibility is specified in the agreement.
  • The scope of delivery and compliance documentation are clearly defined.
  • Any deviation from the standard notification method must be agreed upon.
  • Any changes to the information must be notified in writing.
  • Deliveries made beyond one's authority require authorization and confirmation.
  • Items of unknown origin are not accepted for control.

Exceptions and Exemptions from Approval

When field conditions are limited, there are always exceptions to the established rules regarding drilling and equipment management; the key is to turn those exceptions into verifiable, written conclusions.

It is recommended to establish an exemption record that covers the reason for the request, scope of application, scope of impact, basis for substitution, approval authority, and re-evaluation milestones, and that cross-references the review record. An exemption does not constitute permanent approval; when subsequent versions of documentation, suppliers, or supporting documents change, a reassessment should be conducted to determine whether the historical conclusion remains applicable. This page does not provide any feed rates, rotational speeds, hole size limits, or parameter setup procedures; the descriptions already present in the original text remain unchanged.

Exceptions and Exemptions from Approval

  • Exceptions due to time constraints are inevitable.
  • Exceptions must be documented in writing.
  • Record the reason, scope, and basis.
  • The approval functions and re-evaluation milestones are specified.
  • Cross-references to the review records.
  • Do not provide a value for the alternative condition.

Changes to Trigger Conditions and the Scope of Re-evaluation

Any change in data version, supplier, applicable regulations, or supporting documentation should trigger a targeted reassessment of conclusions related to drilling and equipment management.

The value of a re-evaluation lies in confirming whether historical conclusions remain valid, rather than redoing the entire record from scratch. It is recommended to document changes, the scope of impact, re-evaluation conclusions, and conditions for reinstatement, and to cross-reference these with the original evaluation records and non-conformance reports. For cross-departmental projects, the authorized department should uniformly determine the scope of the re-evaluation to avoid having two sets of criteria coexisting for the same project. This page does not provide any feed rates, rotational speeds, hole limit values, or parameter setup procedures; the descriptions already present in the original text remain unchanged.

Changes to Trigger Conditions and the Scope of Re-evaluation

  • Any change will trigger a reassessment.
  • Determine whether historical conclusions are applicable.
  • The scope of impact and conclusions remain the same.
  • Clearly state the conditions for restoration.
  • Cross-references with the exception record.
  • Avoid having two sets of criteria operating in parallel.

Comparison of Governance Dimensions

Comparing drilling operations with equipment management in terms of focus areas, sources of information, and record-keeping methods helps quickly identify gaps in policies or records that need to be addressed during an audit. The table below is for qualitative classification only and does not replace the conclusions of an audit or approval process.

The table does not provide any formulas, temperatures, times, pressures, quantities, or acceptance criteria. Actual conclusions must be jointly confirmed based on the supplier’s data sheets, on-site operating procedures, applicable standards, contracts, and local regulations, and must be reviewed by personnel with the appropriate qualifications before being filed. The purpose of the table is to ensure that no management items are overlooked; it is not intended to replace any round of actual review or validation. This page does not provide any feed rates, rotational speeds, hole limit values, or parameter setup procedures; the descriptions already present in the original text remain unchanged.

Comparison of Governance Dimensions

  • The form is used for the initial screening review.
  • It is merely a qualitative classification.
  • This is not a substitute for actual verification.
  • No values are provided.
  • The documents and regulations shall prevail.
  • The review findings must be filed.

Client Review and Delivery Checklist

It is recommended to verify, item by item, the definitions of terms related to drilling and equipment management, the versions of applicable standards, supplier documentation, lists of regulations, personnel authorizations, record-keeping ledgers, review records, responsibilities for outsourced work, exemptions from approval, and re-evaluation conclusions. For welding standards, please refer toPCBA Soldering Standards。

The checklist should retain the verification conclusions and descriptions of discrepancies for each round as the basis for revising the procedures. This approach advances management from “filling in records only when asked” to a system characterized by “clear guidelines, defined responsibilities, and traceable processes,” and also enables the rapid identification of specific steps during client audits or internal traceability reviews. For cross-departmental projects, it is recommended that a single checklist be used as a delivery baseline shared by all three parties, with the effective version clearly indicated. This page does not provide any feed rates, rotational speeds, hole tolerance values, or parameter setup procedures; all descriptions already present in the original text remain unchanged.

Client Review and Delivery Checklist

  • Go over the specifications and documentation item by item.
  • Ensure that all statutory authorizations and records are thoroughly reviewed.
  • Review the exemption from outsourcing in conjunction with the verification.
  • The conclusions of the re-evaluation must be consistent.
  • Description of the discrepancy write-back system.
  • The three parties share a single baseline.

Frequently Asked Questions on Drilling and Equipment Compliance Management

1. Why is it important to standardize the terminology first?

Because the same term often carries different underlying assumptions in the design, procurement, production, and inspection phases, failure to align these assumptions in advance can easily lead to conclusions that are all correct but mutually contradictory. It is recommended to establish a terminology cross-reference table that specifies the applicable scope, the version of the reference document, and the responsible party for verification; obsolete terms should be archived separately. This page does not provide any feed rates, rotational speeds, hole limit values, or parameter setup procedures; the descriptions already present in the original text remain unchanged.

2. Why should data and information be based on controlled versions?

Since requirements for documents with the same name may vary across different versions, referencing them by name alone may compromise comparability. It is recommended to record the document number, version number, effective date, and approver, and to archive superseded versions separately; the order of precedence for applicable standards, customer specifications, and internal documents should be specified in advance in the contract.

3. How should safety and environmental protection obligations be incorporated into documents?

It is recommended to establish a list of applicable regulations, documenting the names, versions, effective dates, responsible functions, and review milestones, and to cross-reference compliance conclusions with procurement and delivery documents; occupational protection and waste disposal shall be governed by on-site controlled documents, supplier data sheets, and local regulations. This page does not provide any feed rates, rotational speeds, hole size limits, or parameter setup procedures; the descriptions already present in the original text remain unchanged.

4. What information should the list of authorized personnel include?

It is recommended to specify the positions covered, the scope of authorization, the effective date, the approval functions, and the review points, and to clearly identify revoked authorizations. Revoke permissions promptly when personnel are reassigned or a project ends. Matters involving security and regulatory interpretation should be handled by personnel with the appropriate authority; this page does not provide any methods for qualification determination or decision-making thresholds.

5. What fields should the ledger include?

This should include the time of discovery, the stage at which it was discovered, the sample identification, the version of the reference document, the positions responsible for execution and review, the conclusion category, the nonconformance report number, and the disposition status, and should be linked to the batch, work order, and report numbers. The fields should focus on traceable information rather than recording any reusable conditions. This page does not provide any feed rates, rotational speeds, hole tolerance values, or parameter setup procedures; the descriptions already present in the original text remain unchanged.

6. Under what circumstances should a re-evaluation be initiated?

Any change to the version of the documentation, the supplier, the applicable regulations, or the supporting documents should trigger a targeted re-evaluation to confirm whether the previous conclusions remain valid. It is recommended to document the changes, their scope of impact, the re-evaluation conclusions, and the conditions for reinstatement to avoid having two sets of supporting documentation coexisting for the same project.

7. Why should the scope of responsibility for outsourced work be included in the agreement?

Since verbal agreements cannot be traced back after a version update or personnel changes, it is recommended to clearly specify the scope of delivery, the compliance documentation accompanying the shipment, the procedures for reporting deviations, and prohibited actions, and to require the other party to provide written notification of any changes to document versions. Documents of unknown origin should not be included in the controlled document system.

8. What should be included in the delivery checklist prior to client review?

Recommendations should include terminology definitions, applicable versions, supplier information, a list of regulations, personnel authorizations, record-keeping logs, review records, outsourcing responsibilities, exemptions from approval, and re-evaluation conclusions. For each round, retain the verification conclusions and descriptions of discrepancies, and update the management system accordingly. This page does not provide any feed rates, rotational speeds, hole limit values, or parameter setup procedures; the descriptions already present in the original text remain unchanged.

Conclusion

Laser drilling technology plays a critical role in PCB manufacturing, and there are various types of laser drilling systems to choose from. Selecting the appropriate technology depends on the size, quantity, and quality requirements of the holes. As the demand for smaller, more complex circuits in electronic products continues to grow, laser drilling technology will continue to evolve to meet this demand.

Now, visit the following link for more information about laser drilling technology at PCB manufacturers:


Frequently Asked Questions (FAQs)

1. For which PCB manufacturing needs is laser drilling technology suitable?

Laser drilling technology is suitable for PCBs that require the creation of tiny holes, particularly in high-density circuit layouts and miniaturized circuit designs.

2. What are the advantages of laser drilling?

Laser drilling offers the advantages of high precision, high efficiency, suitability for a wide range of hole diameters, and the ability to process complex structures.

3. Does laser drilling affect the performance of a PCB?

Laser drilling generally does not adversely affect the performance of a PCB, provided that the laser drilling system is properly selected and operated.

4. Which laser drilling technology is best suited for micro-PCB manufacturing?

Ultraviolet laser drilling technology is generally best suited for the manufacture of micro-PCBs because it can produce small-diameter holes.

5. How much does a laser drilling system cost?

The cost of laser drilling systems varies depending on the model and features, and they typically need to be customized to meet specific requirements.

Further Reading:Applications of Laser Drilling in HDI Printed Circuit Boards · What are the different types of PCB vias?